C
CompTIA Server+
605 Questions
Question No. 1
A datacenter has exceeded the load on the central uninterruptible power supply (UPS) for the room and is causing power load problems. Additional power is available, but not using the central UPS. Which of the following is the BEST temporary solution for adding new servers until an upgrade of the central UPS can occur?
Choose the correct option from the given list.
01 / 605