NA
netapp certified support engineer, ontap specialist
58 Questions
Question No. 1
A customer has a 2-node MetroCluster. They experienced a complete power loss at site B. The customer has lost connectivity to site B and now realizes that the DR partner at site A has not taken over the DR partner at site B.
Which two actions must be performed in this scenario? (Choose two.)
Choose all the correct options from the given list.
01 / 58